Shopping Cart
Your shopping cart is empty!
Power Car 43004 entered service in September 1976 and was one of the prototypes for the Brush MTU engine upgrade, this occurring between September 2004 and June 2005. As a result, it did not receive a full overhaul as other members of the class did and so returned to Brush to receive Cab upgrades in November 2007. Power Car 43155 entered service in January 1981 and was overhauled by Brush between April and October 2006. With the introduction of the new Class 800 and 802 IEP units on the Great Western Mainline GWR cascaded remaining IC125 sets to rural routes shortening them to 4 passenger coach ‘Castle’ sets.
Contents
2x Diesel-Electric Locomotive